J <br />• Page 2 March 6, 2002 <br />Griffin # 1 Dttch: This ditch is planned to be realigned. In general, tt will be set to the south edge ~ the <br />gravel pit bourxlary and reenter the existing ddch at the north west comer ~ the gravel pit area. AY the <br />point at which the realigned ddch meets the existing ditch, is the pdM where the ditch enters existing <br />hay meadows. At present, this drtch runs east to west on the Seahorse Ranch properly line at the <br />north boundary of the west portion of the gravel pit area. As such the reentry of the realigned drtch to <br />the existing ditch is inline with the ditch's function to provide irrigating water to the existing hay <br />meadows. See drawing Exhibit "D°. Realignment of the ditch does not at any time go "up hill". tt is to <br />be noted that Gately Living Trust, Seahorse Ranch is responsible for the realignment of the Griffin # 1 <br />Ditch. The Seahorse Ranch will complete this portion of this project, when tt is deemed that tt is <br />necessary to make the realignment. The resigned Griffin # 1 DRch will be on Seahorse Ranch <br />property, will at some pdrrts run through the undisturbed portions of the gravel pit Overall boundary. As <br />to the timing to realign the Griffin # 1 Ditch, R is yet to be detennined. Current estimates are that the <br />ditch wiA be realigned some time beUmeert the 6 and 10 year after the start of excavating of the Overall <br />site. <br />See drawing Fxhibrt "C", ~I operations of the Seahorse Ranch Wes[ Gravel Pit are confined to the <br />locations as noted on this drawing. <br />See drawing Exhibit "E", this drawing demotes directions of excavating. And, denotes that portions of <br />excavated areas to be rectaimed along with the excavation process. <br />Exhibit B - Mirring Plan (Rule 6.4.4) <br />Perimcter fence: The perimeter ferxe is an agreed to item between the Seahorse Ranch and <br />American Concrete and Gravel, LLC. One perimeter fence will be constructed. The Old Railroad <br />Grade Road is to be with in the Overall gravel pit area. Agate already exists on the bridge i.e. entrance <br />to the gravel pit, a second gate will be located at the east end of the road i.e. boundary of the gravel pit. <br />Old Railroad Grade Road: This is the road that is to be use to enter and exit the gravel pit All entry <br />arxf ept to the gravel pit area will be over the existing bridge, west end of the Old Railroad Gratle Roatl. <br />Griffin # 1 Ditch: tt is undetermined just when this dttch will be realigned. tt is expected to be realigned <br />some time between 6 and 10 years after the start of excavating at the site. <br />Discharge of water. See drawing F~ibit "C". See F~khibit "G", this is a copy of the application "Process <br />Water And Stormwater Discharges Assodated WRh Sand And Gravel Production Operations (And <br />Other Nonm~allic Minerals Except Fuel)". The discharge of water from the excavated sites will be <br />entirely on to S~horse Ranch property. This water will flow on to hay meadows, and through various <br />inigating dttd~es, thus, returning to ground water and fdlowing normal hay meadow run off. <br />Wash Plant See drawing Exhibit "C". Silt will be dredged fran the silt pond and will be stockpiled, as <br />shown, and sold as a gravel pit product. <br />Equipment used for excavation, grading slopes, topsoil replacement, processing material, and hatching <br />on stte. The equipment to be used falls under two headings. (1) Excavating/processirrg/batching. All <br />extavating, processing and batctting shall be completed with porfaWe equipment. See drawing Exhibit <br />"E" far site locations. Excavating shall be completed using tracked type excavators, wfteeled front <br />loaders and tracked bulldozers. Processing of materials shall be completed using portade crushing, <br />sorting antl handling equipment. Botching, i.e. asphalt hatching. Concrete hatching is completed off <br />site. Asphalt plarris shall be portable in structure. Ncte, asphalt hatching is a seasonal process, an <br />asphalt plant will only be on site during the warm weather months. (2) Reclamation grading and topsoil <br />replacement. Wheeled motor graders, wheeled front loaders and tracked kxavuler dozers shall be use <br />to complete this type of work. <br />