<br />24. The Division received a comment letter from Susan Steers, in which she states "Our own <br />well source may be interrupted because of their (Agile Stone Systems) activities:' <br />Determine the location of her well and demonstrate to the Division that the pumping of your <br />proposed well and/or blasting will not interfere with the quantity or quality of water at her <br />well location. Do the same for any other residents that have shown concern for their wells. <br />25. During the August 15, 1997 pre-operation inspection, Bill Fehr and Mitch Albert of Agile <br />Stone Systems stated that a berm to screen the mining operation at gravel extraction area B <br />would be constructed southwest of that area. This berm must be discussed in the mining <br />plan. All dimensions of the berm must be provided. Describe where construction materials <br />will come from. Show the berm on the Mining Plan Map and discuss reclamation of this <br />disturbance in the appropriate exhibit. <br />26. At the pre-operation inspection, the Division teamed that the location of sections of the in- <br />permit-area-rail-line would be moved and other sections would be eliminated. Make <br />appropriate changes to the Mining Plan Map. <br />27. It was also learned during the pre-operation inspection that the plant azea for gravel <br />operations will be lowered 4-5 feet or more. Discuss this new land configuration in the <br />mining plan; describe what will be done with the excavated material; show both on the <br />Mining Plan Map and provide any necessary changes to the reclamation plan and map. <br />28. The Division also learned during the pre-operation inspection that natural land will be left as <br />a barrier between Tallahassee Creek and the gravel extraction azeas A and B. Provide the <br />dimensions of this barrier, and your plans for use of filter fabric on the pit side and coarse <br />rock on the creek side. Show this barrier (berm) on the Mining Plan Map and provide a <br />thorough discussion in the reclamation plan. <br />29. It was also teamed during the pre-operation inspection that the gravel pit A and B may <br />receive runoff and process water from the plan[ azea. Provide a discussion of how this water <br />will be controlled to prevent pollution of surface and ground water. <br />30. The Division learned at the pre-operation inspection that the intent of the application was to <br />include Gravel Expansion Blocks 1 and 2 and Granite Quatry Expansion Blocks 1 and 2 in <br />the application as land to be affected and that these azeas are phases of the total mining <br />operation. It was stated that it was not the intent to bring these azeas into the permit by <br />amendment at a later date as previously understood by the Division. If these areas aze part of <br />the application affected land as phases of the mining operation provide appropriate <br />discussion in all appropriate exhibits and change the Mining Plan Maps to show a phased <br />mining operation. If these mining azeas are not to be a part of the present application, <br />remove them from the maps to avoid confusion. If they are to be added at a later date, an <br />amendment could be filed at that time. <br />3l. During the pre-operation inspection it was teamed that the location of the south overburden <br />and topsoil stockpiles will be changed. Please provide a discussion of the new locations in <br />the mining plan and show them on the Mining Plan Map. <br />