Laserfiche WebLink
• 4.4.2.3 Final Reclamation <br />As part of final reclamation, permanent diversion structures will be installed along the <br />contours shown on Drawing D-4-11. These diversions channels drain runoff from the <br />reclaimed refuse embankment. Drainage from the area above the refuse embankment <br />will continue to flow along the County road, diverted permanently away from the head <br />of the disposal site. <br />~~ <br />• <br />4-49 11-99 <br />