My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE42054
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE42054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:35 PM
Creation date
11/20/2007 11:00:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
3/6/2007
Section_Exhibit Name
Exhibit 28 Appendix B
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Task # : 022 <br />Date : 11/08/2006 <br />User: JRS <br />State :Colorado <br />County :Las Animas <br />Site :New Elk Mine <br />PermiUjob #:C-1981-012 <br />Abbreviation :none <br />Filename : C012-022 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or otherjob action :Partial Phase 1 Bond Release SL-02 <br />Task description :Rip Access Roads Prior to Regrading <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :1-shank ripper <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 2.63 acres Rip depth (ft) : 2.00 Volume : 8,486 BCY or CCY <br />Source of estimated quantity :Map 11 <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION ~ ~~~ <br />Alternate methods - <br />Seismic : Seismic velocity <br />Unadjusted production <br />Area : Avg. ripping depth <br />Average ripping width <br />Average ripping length <br />Average dozer speed <br />Average maneuver time <br />Production per unit area <br />Unadjusted production <br />NA feeUsecond <br />NA cu. yds./hour <br />4.05 feeUpass <br />6.08 feeUpass <br />200.00 feeUpass <br />88.00 feeUminute <br />0.25 minutes/pass <br />0.664 acres hour <br />4,338.16 cu. yds./hour <br />Unadjusted production <br />per selected method : 4,338.16 cu. yds./hour <br />Site altitude : 7,500 feet <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shiR/day) <br />Net job correction : 0.83 multiplier <br />Adjusted unit production : 3,600.67 cu. yds./hour <br />Adjusted fleet production : 10,802.02 cu. yds./hour <br />• JOB TIME AND COST <br />Fleet size : 3 dozers) Total job time : 0.79 hours <br />Unit cost : $0.060 per cu. yd. Total job cost : $509 <br />> . <br />~' Z~ /3 -3~ l/~3~ b S~Oz <br />
The URL can be used to link to this page
Your browser does not support the video tag.