Laserfiche WebLink
CIRCES Cost Estimatins~ Software <br />Task # : 023 State :Colorado <br />Date : 11/08/2006 County :Las Animas <br />User : JRS Site :New Elk Mina <br />Agency or organization name :Colorado Division Of Minerals And C <br />Permit or other job action :Partial Phase I Bond Release SL-02 <br />Task description :Rip Mine Entry Area Prior to Rt <br />HOURLY EQUIPMENT COST <br />Basic machine : Caf D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :1-shank ripper <br /> Data source : (CRG) <br /> Utilization <br /> Cost Breakdown : Ownership cost/hour : $74.56 NA <br /> Dozer operating cosUhour : $98.84 100 <br /> Ripper operating cosUhour : $9.99 100 <br /> Operator cosUhour : $32.78 NA <br /> Total unit cost hour : $216.17 Total fleet cost hour : $648.50 <br /> MATERIAL QUANTITIES <br /> Selected estimating method . Area <br /> Alternate methods - <br /> Seismic : NA NA Load factor : NA Bank volume : NA BCY <br /> Area : 17.86 acres Rip depth (ft) : 2.00 Volume : 57,628 BCY or CCY <br />Source of estimated quantity :Map 11 <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feeUsecond Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 4,338.16 cu. yds.mour <br />Area : Avg. ripping depth <br />Average ripping width <br />Average ripping length <br />Average dozer speed <br />Average maneuver time <br />Production per unit area <br />Unadjusted production <br />• JOB TIME AND COST <br />Fleet size <br />Unit cost <br />4.05 feeUpass <br />6.08 feet/pass <br />200.00 feet/pass <br />88.00 feeUminute <br />0.25 minutes/pass <br />0.664 acres/hour <br />4,338.16 cu. yds./hour <br />3 dozers) <br />$0.060 per cu. yd. <br />Site altitude : 7,500 feet <br />Altifude adjustment : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shi(Uday) <br />Net job correction : 0.83 _multiplier <br />Adjusted unit production <br />Adjusted fleet production <br />PermiUjob # :C-1981-012 <br />Abbreviation :none <br />Filename : C012-023 <br />Total job time <br />Total job cost <br />3,600.67 cu. yds.Jhour <br />0,802.02 cu. yds./hour <br />5.33 hours <br />LG'x ZFj /.~ 3 ~ l~/ j3~ 6 SGO z <br />