My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE42054
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE42054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:35 PM
Creation date
11/20/2007 11:00:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
3/6/2007
Section_Exhibit Name
Exhibit 28 Appendix B
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task#: 021 <br />Date : 11/08/2006 <br />User: JRS <br />State : Colomdo <br />County :Las Animas <br />Site :New Elk Mine <br />Permit/job # : C-1981-012 <br />Abbreviation :none <br />Filename : C012-021 <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action : Pafial Phase I Bond Release SL-02 <br />Task description :Rip Haul Roads Prior to Rearar <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : f per day <br />Attachment no. 2 :1-shank ripper <br /> Data source : (CRG) <br />Uhhzabon <br />Cost Breakdown : Ownership cosUhour : $74.56 NA <br />Dozer operating cosUhour: $98.84 100 <br />Ripper operating cosUhour: $9.99 100 <br />Operator cosUhour : $32.78 NA <br />Total unit cosUhour : $216.17 Total fleet cosUhour <br />;.:<: <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic: NA <br />Area : 2.96 <br />NA load factor <br />acres Rip depth (ft) <br />Selected estimating method : Area <br />NA Bank volume : NA <br />2.00 Volume: 9,551 <br />$648.50 <br />BCY <br />BCY or CCY <br />Source of estimated quantify :Map 11 <br />Source of estimated load factor:NA <br />HOURLY PRODUCTION - <br />Alternate methods - <br />Seismic : Seismic velocity <br />Unadjusted production <br />Area : Avg. ripping depth <br />Average ripping width <br />Average ripping length <br />Average dozer speed <br />Average maneuver time <br />Production per unit area <br />Unadjusted production <br />NA feeUsecond <br />NA cu. yds,/hour <br />4.05 feeUpass <br />6.08 feeUpass <br />200.00 feeUpass <br />88.00 feeVminute <br />0.25 minutes/pass <br />0.664 acres/hour <br />4,338.16 cu. yds./hour <br />Unadjusted production <br />per selected method <br />Site altitude <br />Altitude adjustment <br />Job efficiency factor <br />Nef job correction <br />Adjusted unit production <br />Adjusted fleet production <br />4,338.16 cu. yds./hour <br />7,500 <br />1.00 feet <br />(Cat HB) <br />0.83 (1 shi(f/day) <br />0.83 multiplier <br />3,600.67 cu. yds./hour <br />10,802.02 cu. yds,/hour <br />Fleet size : 3 dozers) <br />Total job time : 0.88 hours <br />Unit cost : $0.060 per cu. yd. Total job cost : $573 <br />
The URL can be used to link to this page
Your browser does not support the video tag.