Laserfiche WebLink
1 <br />' surrounding area. Topsoil will be placed on the regraded slopes <br /> and the area will be seeded in accordance with Section E.2. <br />' <br /> E.3.5 Roads <br />' <br /> Roads on the site will be graded to establish drainage <br />' across them and prevent channeling. Compacted road surfaces <br />ill b <br />l <br />d <br />d <br /> w <br />e <br />oosene <br />or rippe <br />and, where possible, steep cut or <br /> fill areas will be graded to reduce slopes. Topsoil will be <br />' placed on flat road surfaces, amended, and planted with the <br /> basic seed mix. Banks and slopes of the road will be hand- <br />' seeded and mulched,if necessary. Any previously existing roads <br /> on the project area will be left after reclamation. <br />' <br /> E.3.6 Other Facilities <br />' . Plant facilities, crushing facilities, and :rll equipment <br /> on site will be decommissioned and removed or salvaged, if <br />' possible. The building foundations will be broken ~p and buried <br /> on site at a minimum depth of two ft. The building and facility <br />' sites will be graded to establish drainage and fill in <br />depressions. Surfaces will be ripped and prepared prior to <br />' being covered with 18 inches of topsoil and reseeded in <br />accordance with the procedures outlined in Section E.~. <br />Most of the drainage control structures will be left in <br />place as permanent channels. The West Pit drainage channels <br />' as well as the ditches around the heap leach facility are <br />permanent ditches. All other ditch structures .and sediment <br />' control structures will be reclaimed upon establishment of <br />successful vegetation on each of the other facility areas. <br /> <br />1 <br />,1 <br />E-18 (Revised 4/20/89) <br />