My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE41912
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE41912
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:28 PM
Creation date
11/20/2007 10:57:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Permit File
Doc Date
11/8/1988
Section_Exhibit Name
EXHIBIT E RECLAMATION PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />' in consecutive sampling over a three to four week period. <br /> The water balance presented in Appendix G indicates that <br />' it will take approximately 24 months to accomplish the <br /> proposed rinsing. As shown in the water balance, during <br />' the final two to three months of rinsing, some of the <br /> neutralized rinse water may need to be eliminated through <br />' a controlled release program, Battle Mountain has <br />d <br />l <br />Th <br />t <br />d f <br />h <br />t <br />i <br />i <br />f <br />l <br /> uc <br />res <br />ng o <br />severa <br />umns. <br />e <br />con <br />e <br />wa <br />er r <br />ns <br />co <br /> results, presented in Appendix I, indicate that the <br />' proposed neutralization plan can be successfully <br /> completed on the leached ore. <br />' <br /> E.3.3.2 Reclamation <br />' <br /> Reclamation of the heap leach area will occur after <br /> detoxification of the heap material and Fond water has <br />' been completed. The heap will be approximately 100-ft <br /> high with outslopes at the angle of repose. The outslopes <br />' will be graded to cover the heap berm, all exposed 1 finer, <br /> the upslope diversion ditches, and the pone areas. Final <br />' heap outslopes will vary from 3H:1V to 4Fi:1V depending <br /> on the location. Pond liners will be folded in on any <br /> material collected in the bottom df the pond prior to <br />' grading over the pond areas. '•`~~ <br />' Following grading of the leach pad areas, topsoil <br /> will be replaced to a depth of approximately 18 inches <br />' and the area will be seeded using the methods outlined <br /> in Section E.2. <br />' <br /> E.3.4 Borrow Area <br />1 f th <br />h <br />b <br />l <br />t <br />th <br />h <br />l <br /> eap <br />eac <br />orrow area, <br />oca <br />ed sou <br />west o <br />e <br />The <br /> facilities, will be utilized in the first six years of <br />' operation. Upon completion of leach pad construction in Year <br /> 6, the borrow area will be regraded to blend with the <br />1 <br />' E-17 (Revised 4/20/89) <br />
The URL can be used to link to this page
Your browser does not support the video tag.