Laserfiche WebLink
<br />Mr. Neil Sprague - 4 - J nuary 14, 1986 <br />i <br />8. An expected reclamation cross-section would be helpful. <br />9. The applicant should commit to analyzing the salvaged (reclamation <br />material to determine what, if any, fertilizer is nec ssary to help <br />revegetation. <br />10. Unless immediate plans for housing construction are an icipated in <br />this area, the operator must commit to reclaiming to m~untain grass <br />land. <br />11. Wi11 all haul/access roads be reclaimed? Those propos~d as <br />permanent must be clearly delineated. ', <br />12. The reclamation plan states that SCS recommendations will be <br />followed. Reclamation costs include seedlings not recommended by <br />SCS. How will the seedlings be planted? <br />13. The right-to-enter document contains no signature pageor legal <br />description. These must be shown. <br />14. The operator must commit to establishing a barrier bet een quarry <br />operations and County Road 27. The Division recommend a barrier <br />of no less than 100 feet to ensure the safety of the p blic using <br />this road. <br />15. Reclamation costs are based upon the Division completi g <br />reclamation because of inability on the opertor's part These <br />costs must include equipment rental by the Division, h wever <br />maximum bond for a 110 permit can not exceed 55,000.00 I have <br />attached a reclaculation of these costs. <br />Arkins Park South <br />1. The application should contain a commitment to salvagi g all <br />available topsoil and fines for later use in reclamati n. The map <br />should show where the salvaged material will be stocky led. The <br />operator must commit to seeding this material to preve t erosion if <br />stockpiles will remain in place far more than one seas n. <br />2. The map must identify any adjacent landowners. <br />3. The map allows 1 acre for road construction. All exis~ing and <br />proposed roads must be shown on the mine plan maps. <br />4. How deep will these quarries be mined? <br />5. Will any vertical highwalls be left upon completion of mining? <br />6. What will be the general slope of the reclaimed area? <br />7. What will be done to make the banks "secure" as stated <br />permit/application? <br />in the <br />