Laserfiche WebLink
<br />' mining boundary. An additions{ 6 wells are permitted, but no[ located according [o SEO <br />records. <br />The Cacfte La Poudre River should serve as a ground water divide and therefore, no alluvial <br />ground water declines are expected south of the river from any dewatering activities at the <br />' site. <br />' 3.04 Water Requirements <br /> Ground water will be consumed at the mining operation by evaporation of exposed ground <br />' water and water in the extracted produc[. The annual evaporation is approximately 2.3 feet <br /> per acre. For the In-Place Mining Plan, phases 1. 2, and 3 will expose approximately a total <br />' of X1.4 acres. Ivtining of Phase =t will expose approximately an additional 8.0 acres. At a <br />du <br />i <br />r <br />ti <br />a <br />If th <br />f 200 <br />000 t <br />l <br />f <br />i <br />i <br />ill <br />t l3 <br /> ng w <br />pro <br />c[ <br />on <br />ate o <br />ons per year. comp <br />e <br />on o <br />m <br />n <br />occur a <br />ye <br />rs. <br />e <br />. <br /> ditch is reloca[ed, phases 1, Z and 3 will expose approximately a [oral of 40 acres. blining of <br /> n <br />the plant si[e will expose an additional 8 acres. Completion of mining will occur at l~ years <br /> at the previous production rate. <br /> <br /> For the In-Place Mining Plan, approximately 3.8 acres of ground water will be exposed <br />' annually. :\t an evaporation rate of 2.3 acre-feet per acre. the first year annual evaporation <br />ill b <br />i <br />l <br />d <br />ill i <br />ll <br />il th <br />8 <br />8 <br />f <br />b <br />lik <br /> w <br />e approx <br />mate <br />y <br />acre- <br />eet an <br />w <br />ncrease <br />y a <br />e amount annua <br />y un[ <br />e <br />. <br /> mining is comple[ed. Annual depletion at the end of mining for the In-Place Plan will be <br />' approximately 11d.8 acre-feet. <br /> <br /> <br /> <br /> <br />1 <br />1 <br /> <br /> <br />For the Relocation Ivlining Plan, approximately 3.6 acres of ground water will be exposed <br />annually. First year evaporation will be approximately 8.3 acre-feet and annual depletion a[ <br />the conclusion of mining will be approximately 114.8 acre-feet. <br />Depletion of the ground water will also occur from water in the product. The amount of <br />water removed from the site in the product is Four percent by weight. The estimated annual <br />depletion from removal of product is ~.9 acre-fee[. During [he las[ year of th [n-Place [vlining <br />Plan, the maximum annual rate oFdepletion is 12L7 acre-feet, for the Relocation Plan, the <br />maximum annual rate is 120.7 acre-feet. <br />8.05 Project Water Supply <br />Prior to exposing the ground water the applicant will be required by the State Engineer's ~' <br />Office to obtain a well permit and Substitute ~~':uer Supply Plan. The .Applicant does not own <br />senior a:ttzr ri~_hts in the Oeilvv Ditch. <br />(.'1'BUllir'I1 )u ti,; '~i,- •_rtdc.grrnui.rcn.N J... <br />19 <br /> <br />