Laserfiche WebLink
<br /> <br />1 <br /> <br /> <br /> <br />1 <br /> <br /> <br /> <br />~~ <br />I <br /> <br /> <br />1 <br /> <br /> <br /> <br /> <br /> <br /> <br />Based on our current assessment of the property's reserves (average ~9 ft [hick), overburden <br />thickness, approximate produc[ion rate of 200,000 tons per year and volume calculations for <br />the minable acreages as shown on Figures D-1 and D-2, [he following timetables are <br />proposed for [he four mining phases: <br />Oailvv Di[ch In-Place <br />Phase Minable Acreage' Estimated Production' Duration' Remarks <br />l 5.0 264,170 L3 Dry/Wet <br />2 19.0 1,003,846 5.0 DrvJWe[ <br />3 17.4 919,312 4.6 Dry/Wet <br />4 8.0 422,672 2.1 DcylWet <br />Total - 50.0 2,6L0,000 13 <br />,~ <br />OQilvv Ditch Relocated <br />Phase Minable Acreage' Estimated Production' Duration Remarks <br />l 5.0 264,170 1.3 Drv/Wet <br />2 19.6 1,266,537 6.3 Dry/Wet <br />3 14.9 976,621 4.9 Dry/Wet <br />4 8.0 422,672 2.l DrylWet <br />Total ' 49.9 2,930,000 14.6 <br />Notes: I. h(inable acreage in acres. <br />2. Production in tons (assumes conversion factor of I.ds tonslcubic yard). <br />3. Durarion in years (assuming production of 200,000 tons/year). <br />It is assumed that all minine operations, including initial mobilization and final reclamation <br />grading and seeding, will be accomplished within a l5 to l8 year life span given current <br />economic projections and anticipated average production. <br />The proposed mining operation will consist of dry mining the upper 30 ft of material and wet <br />mining product to bedrock with a dragline, windrowing. then transportation [o a nearby <br />conveyer belt which will carry the material to the proposed processine plant located on Ash <br />Avenue, Mining will include the following elements performed generally in the order listed <br />Some activities will occur concurrendv: <br />~). PkUI L~ IS~_'t~~r~: (Bcrle~•s rcrlc.p/nni. rc.rd ~rc <br />