Laserfiche WebLink
B. TRANSFER POINTS <br />Number of transfer points: 3 <br />• Proposed controls: Full and partial enclosures <br />Controls for transfer points include: Full enclosure, partial enclosure, water sprays, chemical suppressants, no <br />controls, other (specify) <br />VIII. FINISHED PRODUCT <br />A. LOADING INTO FINISHED PRODUCT STOCKPILE <br />Method of loading in (front-end loader, conveyor, etc. ): Conveyor <br />If conveyor is used, what is maximum drop height? 30 feet <br />Loading schedule: 2,000 tonslhour, 4 hours/day, 100 (maximum) days/year <br />Proposed controls: Reduced drop height <br />Controls for loading to stockpile include: no control, water sprays, total enclosure, partial enclosure, chemical <br />suppressants, reduced drop height, telescoping chute, other (specify) <br />B. FINISHED PRODUCT STOCKPILE <br />• Maximum stored at one time: 20,000 tons Length of time pile remains undisturbed: 10 days <br />Proposed controls: (check appropriate boxes) <br />^ Watering: times/day, or ^ continuous sprinkler (to maintain moist surface) <br />^ Chemical stabilizer (applied according to tttanufacturer's specifications) <br />^ Compacting of piles, method: <br />^ Enclosures: complete, or partial (check one) <br />^ Revegetation (Length of time till revegetation: ) <br />^ Other (specify): <br />^x No control <br />• <br />7 <br />