My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE41700
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE41700
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:19 PM
Creation date
11/20/2007 10:51:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Tab 22 AIR QUALITY CONTROL PLAN
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. LOADING OUT FROM STOCKPILE FOR FINAL TRANSPORT <br />• <br />Method of loading out (front-end loader, conveyor, etc.): Front-end loader <br />If conveyor is used, what is maximum drop height? feet <br />Loading schedule: 300 tons hour, 16 hours/day, 125 (maximum) days/year <br />Proposed controls: Reduced drop height <br />Controls for loading out of stockpile include: Water injection, chemical dust suppressants, bag collectors, no control <br />water sprays, total enclosure, partial enclosure, chemical suppressants, reduced drop height, telescoping chute, other <br />(specify) <br />IX. VEHICLE HAUL ROADS <br />CONTROL OPTIONS FOR VEHICLE HAUL ROADS <br />(DO NOT WRITE IN THIS SECTION) <br />I. Watering (specify): times/day, to maintain moist surface <br />2. Chemical stabilvation (according to manufacturers specifications) <br />• <br />Specify: <br />a. Frequency of application: <br />b. Type of stabilizer (brand name or composition): <br />3. Paving to be completed by: <br />(date) <br />4. Gravel <br />• <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.