Laserfiche WebLink
(LIST PROCESSING CONTROLS IN THE APPROPRIATE SPACES BELOWI <br />A. PRIMARY CRUSHING - N/A <br />• Maximum gushed per year: tons <br />Hours of crushing per day: hours <br />Proposed controls (see above): <br />B. SCREENING/CLASSIFYING - N/A <br />Maximum screened per year: tons <br />Hours of screening per day: hours <br />Proposed controls (see above): <br />Maximum crushed per hour: tons <br />Maximum screened per hour: tons <br />C. SECONDARY CRUSHING - N/A <br />• <br />Maximum crushed per year: tons Maximum crushed per hour: tons <br />Hours of crushing per day: hours <br />Proposed controls (see above): <br />D. RESCREENING/CLASSQFYING - N/A <br />Maximum screened per year: tons Maximum screened per hour: tons <br />Hours of rescreening per day: hours <br />Proposed controls (see above): <br />VII. ~ONVEYORS/I'RANSFER POINTS <br />A. <br />• <br />Material conveyed per year: 500,000 tons <br />Proposed controls: Full and partial enclosures <br />Material conveyed per day: 7,000 tons <br />Controls for conveyors include: Full enclosure, partial enclosure, no control, other (specify) <br />(INDICATE ON A SEPARATE DIAGRAM HOW CONVEYOR SYSTEM IS SET UP) <br />6 <br />