Laserfiche WebLink
C. RAW MATERIAL STOCKPQ.E - N/A <br />• <br />MATERIAL ROCK COAL OTHER <br />Maximum tons stored at an one time <br />Length of time pile remains undisturbed <br />Proposed controls for raw material stockpile: (check appropriate bo:es) <br />^ Watering: times/day, or ^ continuous sprinkler (to maintain moist surface) <br />^ Chemical stabilizer (Type: ) <br />^ Compacting of piles, method: <br />^ Enclosures: complete, or partial (check one) <br />^ Other (specify): <br />^ No control <br />D. LOADING OUT FROM RAW MATERIAL STOCKPILE - N/A <br />L J <br />• <br />Method of loading out (front-end loader, conveyor, etc.): <br />Loading schedule: tons/hour, <br />Proposed controls for loading to stockpile: <br />hours/day <br />days/year <br />Controls include: no control, water sprays, total exposure, partial exposure, moist material, other (specify) <br />VI. PROCESSING <br />Will processing (i. e., crushing, screening, etc.) occur on site? ^ Yes ^x No (check one) <br />NOTE: ALL PROCESS EQUIPMENT REQUIRES A SEPARATE PERMTT APPLICATION AND ADEN <br />(SEPARATE FORM IS ATTACHED AT END OF THIS FORM -MAKE ADDITIONAL COPIES AS <br />NEEDED). <br />Material loaded into processing equipment by: <br />^ Conveyor ^ Front end loader ^ Other: <br />CONTROLS FOR PROCESSING INCLUDE: Moist or wet materials (specify moisture °/. if known), <br />water spray bars, bag filters, other (specify), no control. If existing processing equipment will be relocated <br />from another location complete the following sections. This equipment must already be permitted. <br />5 <br />