Laserfiche WebLink
IV. BLASTING - N/A <br />U <br />MATERIAL OVERBURDEN ROCK COAL OTHER <br />No. of blasts er da <br />No. of blasts er ear <br />No. of blastin da s er ear <br />Pro osed controls <br />Is sequential blasting used ^ Yes ~ No (check one) <br />V. RAW MATERIAL - N/A <br />A. REMOVAL - N/A <br />U <br />MATERIAL ROCK COAL OTHER <br />Tons removed er ear <br />Maximum tons removed er da <br />E ui ment used for removal <br />E ui ment ca aci in tons <br />Estimated hours er ear r wired for removal <br />Material silt content, if known <br />Specify moisture content, if known (%) <br />B. LQADING INTO RAW MATERIAL STOCKPILE - N/A <br />Method of loading in (truck bottom dump, front-end loader, etc.): <br />Loading schedule: tons/hour, hours/day, days/year <br />Proposed controls for loading to stockpile: <br />Controls include: no control, water sprays, total enclosure, partial enclosure, chemical suppressants, reduced drop <br />height, telescoping chute, other (specify): <br /> <br />