Laserfiche WebLink
environmental problem or of preventing basic access to the reclaimed area, Sun <br />• Coal Company will initiate corrective action as soon as weather and surface con- <br />ditions allow. This corrective action will be coordinated with the CMLRD. <br />If maintenance or mitigation is required, Sun Coal Company will provide <br />maintenance of the road system at least on an annual basis and otherwise as <br />needed. Maintenance will probably occur in the spring following snow melt, and <br />all maintenance will be documented and provided to the Division in the annual <br />report. If, on the basis of any report by Sun Coal or by CMLRD, the Division <br />believes any component of the system will fail or has failed, a review of the <br />component will be initiated to determine maintenance needs, alternatives, and/or <br />mitigation. <br />In addition to monitoring the haul road, the reclaimed mine area will be <br />monitored for stability. <br />• <br />Sun Coal Company will regularly monitor the surface stability of the back- <br />filled area of the Meadows ifl mine. Sun Coal Company will submit these moni- <br />toying reports and a summary of such observations annuall to the Division <br />(Stipulation No. 1 issued October I, 1983). <br />Surface Water Monitoring <br />Surface water will be monitored pursuant to Technical Revisions 05 and 06 <br />until the quality and quantity are consistent with baseline conditions and when <br />CMLRD has released Sun Coal Company of this monitoring obligation. <br />• <br />- 376 - (Rev. 5/86) <br />