Laserfiche WebLink
<br /> <br /> <br />Phase 5 <br />Time: 4 years <br />• <br />Topsoil from Area BS will be removed and stockpiled in the <br />designated area as shown on the mining and reclamation map. <br />This topsoil will be segregated and vegetated with Annual <br />Rye and Indian Ricegrass to preserve the soil. <br />Overburden from Area BS will be backfilled fn Area B3. <br />The overburden material in B1 and B2 will be contoured to a <br />slope of 2 to 1 or less, leveled, graded and available <br />topsoil will be spread 8 to 12 inches thick over the area. <br />The area will be revegetated with: Indian Ricegrass, 3.211/acre; <br />SJestern Wheatgrass 4.011/acre; Mountain Mahogany, 4.011/acre; <br />Sage, 1.511/acre; Rabbit Brush, 2.5 li/acre. Ponderosa seedings <br />@ 10 seedings per acre. <br />• <br />