Laserfiche WebLink
<br /> <br /> <br />Phase 4 <br />Tine: 3 years <br />• <br />Topsoil frog Area B4 cai11 be removed and stockpiled in the <br />designated area as shown on tha mining and reclamation msp, <br />This topsoil will be segregated and vegetated with Annual <br />Rye and Indian Ricegrass to preserve the soil. <br />Overburden from Area B4 will be backfilled into B2 along <br />the high wa'_'_ and contoured to a slope of 2 to 1 or less. <br />• <br />