Laserfiche WebLink
<br /> <br />Phase 3 <br />Time: 3 years <br />T_opsoa from Area B3 will be removed and stockpiled in the <br />designated area as shown on the mining and reclamation map. <br />This topsoil ~oill be segregated and vegetated with Annual <br />Rye and Indian Ricegrass to preserve the soil, <br />Overburden from Area B3 will be backfilled into Area B1. <br />U <br />• <br />