Laserfiche WebLink
n <br />U <br /> <br /> <br />Phase 2 <br />Time: 3 years <br />• <br />Topsoil from Area B1 and S2 will be removed and stockpiled <br />in the designated area as shown on the mining and reclamation <br />map. This topsoil will be segregated and vegetated with <br />Annual Rye and Indian Ricegrass to preserve the soil. <br />The overburden from Area A will be backfilled into the <br />excavation, contoured to a slope of 2 to 1 or less, leveled <br />and covered with the available topsoil. The area will be <br />revegetated with: Indian Ricegrass, 32.11/acre; Western Wheat- <br />grass, 4.011/acre; Mountain Mahogany, 4.011/acre; Sage, 1.511/acre; <br />Rabbit Brush, 2.511/acre. Ponderosa seedings @ 10 seedings <br />per acre. <br />• <br />