Laserfiche WebLink
<br /> <br /> <br />RECLA`L4TION TIME TAELE <br />?hase 1 <br />Time: 4 years <br />• <br />Topsoil from Area A will be removed and stockpiled in the <br />area designated on the mining and reclamation map. This <br />topsoil will be segregated and vegetated with Annual Rye <br />and Indian picegrass to preserve the soil. <br />Topsoil from the stockpile area will be removed to an aver- <br />age of 10 to 24 inches, stockpiled, segregated and vegetated <br />with Annual Rye and Indian Ricegrass to preserve the soil. <br />As with the topsoil from the quarry area the topsoil will be <br />segregated in an area to minimize erosion, limit rehandling <br />and will be vegetated to preserve it from wind and water <br />erosion. <br />• <br />