Laserfiche WebLink
<br /> <br /> <br />Phase 6 <br />Time: 4 years <br />• <br />Topsoil from Area B6 will be removed and stockpiled in the <br />designated area as shown on the mining and reclamation map. <br />This topsoil will be segregated and vegetated with Annual <br />Rye and Indian Ricegrass to preserve the soil. <br />Overburden from Area B6 will be backfilled into Area B4 along <br />the resulting high wall and contoured to a slope of 2 to 1 <br />or less. <br />The overburden in Areas B3 and B4 will be backfilled with <br />the material from the adjacent perimeter area, contoured to <br />a slope of 2 to 1 or less, graded and leveled. Area B3 <br />caill be covered with the remaining available topsoil 8 to 12 <br />inches thick. Area B3 and B4 will be revegetated with: Indian <br />Ricegrass, 3.211/acre; Western Wheatgrass, 4.011/acre; Mountain <br />Mahogany, 4.011/acre; Sage, 1.511/acre; Rabbit Brush, 2.511/acre. <br />Ponderosa seedings @ 10 seedings per acre. <br />• <br />