My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE40162
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE40162
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:43:11 PM
Creation date
11/20/2007 10:11:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Exhibit 43 Original WEM Site Construction Specifications & Drawings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.06 Correction of Work • <br />The Contractor shall promptly remove from the premises all Work rejected by the <br />Owner for failure to comply with the Contract Documents, whether incorporated in <br />the construction or not, and the Contractor shall promptly replace and re-execute <br />the Work in accordance with the Contract Documents and without expense to the <br />Owner and shall bear the expense of making good all Work of other Contractors <br />destroyed or damaged by such removal or replacement. <br />All removal and replacement Work shall be done at the Contractor's expense. If <br />- the Contractor does not take action to remove such rejected Work within ten (10) <br />' days after receipt of written notice, the Owner may remove such Work and store <br />the materials at the expense of the Contractor. <br />f 1.07 Operation of the Bear Mine During Construction <br />The construction of this project shall in no way damage the ongoing operations of <br />•- the Bear Coal Company. Coordination and cooperation with Mr. Bill Bear or other <br />designated representatives of the Bear Coa] Compeny is mandatory. <br />1.08 Environmental Considerations <br />' The Contractor shall at all times keep the disturbance to vegetation and wildlife to <br />a minimum. <br />1.09 Access • <br />Mine access will be coordinated with the Colorado Division of Highway's planned <br />3.5 mile highway relocation of Route 133 which will provide a permanent heavy- <br />duty bridge to the property. This bridge should be available for use by ARCO <br />contractors by April, 1981. A temporary earthen access bridge is provided by the <br />State Highway in conjunction with the construction of the new heavy duty bridge. <br />The Contractor may use this bridge until the permanent bridge is constructed. The <br />Contractor shall coordinate his activities and use of this bridge with ARCO and the <br />I State Highway contractor. <br />~- <br />During construction, short-term access across the river to the mine site may be <br />~ provided via ARCO's existing bridge currently serving the Bear Mine. Such loads <br />I shall be less than 10 tons. <br /> <br />• <br />01010-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.