Laserfiche WebLink
n <br />u <br />(v) Specific environmental monitoring required to <br />measure compliance with 4.24 during and after mining and <br />reclamation operations, <br />The materials included in Phase 1 and this (Phase 2) <br />report are presenting the baseline data required by MLRD, and the <br />following chapters of this report are addressing the pertinent <br />MLRD regulations: <br />Chapter 3.0 Essential Hydrologic Functions <br />[2.06.8 (4) (a) (i)] <br />Chapter 4.0 Existing and Future Disturbance <br />[2.06.8 (4) (a) (ii)] <br />• <br />Chapter 5.0 Impact of the Facility on Essential <br />Hydrologic Functions <br />[2.06.8 (4) (a) (iii)]a <br />Chapter 6.0 Restoration of the Essential Hydrologic <br />Functions of the AVF After the Termination <br />of Mining Activities <br />[2.06.8 (4 (a) (iv)] <br />Chapter 7,0 Monitoring Program <br />[2.06.8 (4) (a) (v)) <br />• <br />4 <br />GE6NYDR0 CONSULNNG, INC. <br />