My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR13418
DRMS
>
Back File Migration
>
Application Correspondence
>
3000
>
APPCOR13418
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:33:40 PM
Creation date
11/19/2007 2:41:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981053
IBM Index Class Name
Application Correspondence
Doc Date
5/29/1986
Doc Name
BLUE FLAME COAL MINE FN C-81-053 ADEQUACY 2
From
MLRD
To
CARWIN BLEIDT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-~- <br />2. The Division is fully aware that the roads leading to this site have <br />been in place for a number of years, However, Blue Flame still must <br />address the specifications of Rules 4.03.1(3) and (4) as requested in <br />our earlier correspondence. <br />4.05 Hydrologic Balance <br />To meet the requirements of Rule 4.05.6(11)(c), the Division suggests <br />the attached document be executed on a quarterly basis with a copy <br />retained at the mine site and a copy submitted to the Division. <br />2. Will water be diverted into the underground workings? If so, the <br />requirements of Rule 4.05.16 must be addressed. <br />4.06 Topsoil <br />This section of the application should be modified since new areas will be <br />disturbed by the construction of the sediment pond and upland diversion <br />ditches. <br />4.08 Use of Explosives <br />1. Please provide a copy of the Division of Mines permit to use and store <br />explosives once Blue Flame has received the permit. <br />2. Rlue Flame needs to depict the location of the powder magazine(s) on <br />the appropriate map(s). <br />4.11 Coal Processing Waste <br />1. The Division agrees with Blue Flame's statement of no coal processing <br />on this site. The only "processing to be accomplished is screening and <br />crushing of coal on the mine bench". One by-product of this <br />"processing" will be coal fines. Blue Flame needs to address the <br />deposition of these coal fines both during mining operations and with <br />final reclamation. <br />2. The requirements of rule 4.1].4 pertaining to noncoal waste needs to be <br />addressed. <br />4.20 Subsidence Control <br />Prior to the Division being able to approve the subsidence plan, the <br />Division needs to review the response to Rule 2.05.6 concern 2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.