-6- <br />and when they were drilled. Also, please be advised that any future <br />drilling must be approved by the Division prior to undertaking these <br />activities. If there are no drill holes, Blue Flame should delete this <br />discussion. <br />2.05.5 Post-Mining Land Use <br />1. Once Biue Flame has successfully obtained the air emission permit, <br />please submit a copy for our files. <br />2. Concern 2 of our March 3rd letter still needs to be addressed. <br />2.10 Maps and Plans <br />1. The Division is perplexed as to why the submitted maps do not contain <br />the required certification as specified via Rule 2.10.3(2). Mr. Meiers <br />had several conversations about this matter with the Division and was <br />informed that the requirements of this rule must be met. If Mr. Meiers <br />is a registered, professional geologist then he needs to sign and <br />certify each submitted map. If Mr. Meiers is not, then Blue Flame <br />needs to get someone that does meet the specifications of Rule <br />2.10.3(2) to sign and stamp each submitted map. (This need for <br />certification applies to all maps save the Mine Plan View which does <br />contain the required information. The Geologic Map does have a stamp, <br />however, we need the original certification and signature.) <br />2. Based on our review of the submitted maps, it is unclear if or which <br />access road(s) is to be included into the permit. One or both access <br />roads needs to be clearly marked within the proposed permit boundaries <br />as requested under points 1.A. and l.e of our March 3 letter. <br />4.02 Signs and Markers <br />1. As requested in our earlier letter, "Blue Flame should specify...the <br />type of perimeter markers to be installed around the affected area". <br />2. 1f both access roads will be utilized, then Blue Flame will need to <br />install a mine identification sign at each entrance. <br />3. Blue Flame should specify the type of marker to be used to demark the <br />topsoil pile (see Rule 4.02.7). <br />4.03 Roads <br />The Division is unable to approve retention of the roads into this site <br />as part of the relcamation plan unless the requirements of Rule <br />4.03.1(1)(f) are satisfied. <br />