Laserfiche WebLink
-8- <br />2. The Division believes it is necessary for Blue Flame to conduct <br />quarterly subsidence monitoring for at least one year to develop a <br />"baseline" for future monitoring purposes. <br />3. The Division suggests the monitoring locations be developed as depicted <br />on the attached diagram (Figure 4). <br />PVOC/ddt <br />0664E <br />