Laserfiche WebLink
<br />FINDINGS FOR ROADSIDE <br />AND CAMEO NINES <br />I. Legal, Financial and Compliance Information (2.03) <br />An explantion acceptable to the Division of the role of Western <br />Associated Coal Corp. will be provided as part of the permit application. <br />III. Cultural and Historic Resources (2.04.4, 2.05.6(4)) <br />A map locating the sites listed by the Colorado Historic Preserva- <br />tion Office will be provided. <br />V. Surface Water Hydrology (2.04.5, 2.04.7, 2.05.3(4), 2.05.6(3), 4.05) <br />Stipulation No. 1: <br />A review of all existing ponds will be performed and within one <br />month, a report certified by a registered professional engineer will be <br />submitted representing a plan to bring existing structures into compliance. <br />Certification of the remaining ponds shall be submitted immediately following <br />construction in accordance with rule 4.05.6(7). <br />Stipulation No. 2:- <br />Powderhorn Coal Company accepts Stipulation No. 2. <br />VI. Ground Water Hydrology (2.04.5, 2.04.7, 2.05.6(3), 4.05) <br />Stipulation No. 3: <br />Powderhorn Coal Company accepts Stipulation No. 3. <br />Stipulation No. 4: <br />Powderhorn Coal Company accepts Stipulation No. 4. <br />VII. Cumulative Hydrologic Impacts (2.05.6(3)) <br />Powderhorn Coal Company has specified mining method i.e. longwall or <br />room and pillar for the Rapid and Cottonwood Creek areas. Powderhorn under- <br />stands the Divisions concerns on [his matter and feels that the plan committed <br />to (see the subsidence section description) is a satisfactory method of <br />relieving the concerns. <br />VIII. Alluvial Valley Floors (2.06.8, 4.24) <br />Stipulation No. 5: <br />Powderhorn Coal Company accepts Stipulation No. 5. <br />