My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR12981
DRMS
>
Back File Migration
>
Application Correspondence
>
2000
>
APPCOR12981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:33:18 PM
Creation date
11/19/2007 2:36:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Application Correspondence
Doc Date
8/9/1996
Doc Name
BOWIE 2 MINE NEW PERMIT APPLICATION PN C-96-083
From
DMG
To
JE STOVER & ASSOCIATES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Jim Stover <br />August 9, 1996 -New App.Bowie 2 <br />Page 8 <br />of the U. S. Army Corp of Engineers included in our letter of May 31, 1996, and the Army <br />Corp of Engineers' letter of March 21, 1996. <br />2.04.11 -Fish and Wildlife Resources Information <br />22) Please provide the requested Fish and Wildlife study as soon as possible. <br />23) BRL indicates that Morrison Knudsen has been instructed to add conveyor crossings. <br />Provide the fmal details of these plans. How were concerns conveyed in the CDOW letter <br />dated April 11, 1996 resolved? <br />2.04.12 -Prime Farmland Resources <br />24) Response accepted based upon the statement that the referenced soils will not be disturbed. <br />2.04.13 -Annual Reclamation Report - No response necessary. <br />2.05.2 -Operations Plan -Life of Operation - No response necessary. <br />2.05.3 -Operation Plan -Permit Area <br />25) This concern requires response from BRL. BRL hired Momson Knudsen (M-K) to address <br />the geotechnical stability of the proposed surface facility azea of the Bowie No. 2 Mine. <br />M-K, in turn, subcontracted with Maxim Technologies, Inc., to complete a geotechnica( <br />investigation of the site. Separate adequacy comments have been prepared by the Division <br />and forwarded under sepazate cover to BRL to expedite finalization of this "Preliminary <br />Geotechnical Study". In general the field analysis and data collection were adequate. <br />However, the study focused upon the traditional operation life concern, to the relative <br />exclusion of the reclaimed configuration's geotechnical stability. The long term <br />geotechnical stability of the proposed reclaimed configuration of the surface facilities will <br />have to be thoroughly analyzed. <br />26) Please specify the timeframe for completion of the culvert upgrade referenced in the BRL <br />response. <br />27) This concern requires response from BRL. BRL states; "Slope stability analysis of the <br />reclaimed slope will be performed based on the in progress M-K geotechnical study and <br />submitted at a later date." The Division, however, cannot propose a decision until this issue <br />is adequately addressed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.