Laserfiche WebLink
Mr. Jim Stover <br />August 9, 1996 -New App./Bowie 2 <br />Page 6 <br />ix) BRL will be required [o effectively monitor the upper perched water zone. Impacts <br />to this zone can translate to water impacts at the surface. The proposed D-seam <br />overburden wells should provide valuable upgradient information. Please propose <br />an additional D-seam overburden well locations at the downgradient area of the <br />mine. Downgradient D-seam overburden baseline and operational data will be <br />required. <br />x) Please propose a downgradient D-seam monitoring well for baseline and operational <br />monitoring. <br />xi) Some of the proposed wells appear to be within mining zones. How will monitoring <br />proceed as required if and when these initial installations are mined through? <br />xri) Wells DH-38 and DH-13 are shown as monitoring points on Map 09. Please add <br />reference to these wells on page 2.05-7 and provide completion diagrams. <br />xiii) Please provide the baseline data for DH-34C. <br />xiv) Please provide the baseline data for DH-13. <br />xv) The DMG recommended monitoring of ephemeral streams during our meeting of <br />April 1995. Page 2.04-34 indicates that no monitoring was conducted on Stevens <br />Draw since 1984; however, Exhibit 3 indicates some 1995 monitoring at Stockpond <br />P-1. Current baseline monitoring on both Stockpond P-1 (see #13-ii above) and on <br />Stevens Draw are needed. Provide appropriate upstream and downstream baseline <br />information for Stevens Draw, and provide an operational monitoring scheme for <br />Stevens Draw. <br />xvi) Freeman Gulch should have been monitored during the spring of 1995. Please <br />obtain upstream and downstream baseline monitoring data, and provide an <br />operational monitoring scheme. <br />xvii) Provide more specific upstream and downstream baseline monitoring data for <br />Gulches A, B, C, and D. The text indicates possible spring nrnoff and this should <br />have been monitored. Also add an operational monitoring scheme to the permit <br />application. <br />xviii) Please provide upstream and downstream baseline data and an operational monitoring <br />scheme for the North Fork of the Gunnison River. Please provide revised Exhibit <br />3 Tables, permit application text pages, map revisions, and figure revisions as <br />appropriate. <br />