Laserfiche WebLink
<br />DMG: Alright for engineers to qualify certification (should include brief <br />description of methods used to derive maps). <br />HGTI: Mapping of water related information requested is complicated by the <br />presence of the City of Hayden within one mile of the permit boundary. <br />DMG: Alright to put emphasis on information outside city limits (with the <br />possible exception of major water supply intakes to the city). <br />19. Threatened and Endancered Soecies <br />DMG: USFWS appears to be satisfied with our responses concerning non-fish <br />species. HGTI should include writeup on all species of concern in permit. <br />20. Protected Stream Statue <br />HGTI: HGTI will designate Dry Creek as a biological community and mark it. <br />DMG: Alright to wait until we can get <br />together where signs would be necessary. <br />been entered, as approved by the Division, <br />defining the buffer zone. <br />together in the field to ascertain <br />Locations where the buffer zone has <br />should be noted in the permit when <br />21. USFWS Concerns <br />HGTI: HGTI will do water balance and make commitment to pay one-time fee to <br />USFWS fund. [This should address USFWS concerns for listed fish.] <br />22. Pond Caoacitv <br />HGTI: Will do as suggested. <br />23. Diversion Ditches <br />DMG: HGTI should give us designs for all structures conveying water to other <br />designed structures. Do to weather conditions at the site, this can not be done <br />immediately. HGTI should commit to submitting designs by the end of summer, 1993 <br />or we can stipulate the permit ae such. Designs for the 14 additional culverts, <br />suspected to be present at the northern end of the permit area, should be <br />submitted when their statue becomes known. <br />26. Haul Road <br />DMG: HGTI has the option of removing the interior ditch on the loop '•road^ or <br />designating the loop a haul road. DMG believes that the alternate specifications <br />portion of the road regulations will protect HGTI from having to redesign or <br />reconfigure road and this would be eo stated in the findings document. <br />25. Access Road <br />DMG: The road between Haul Road # 2 and the truck hopper can be designated an <br />access road. See remarks above. <br />27. Sewaoe Treatment <br />HGTI: A leach field exists at the site. HGTI will improve wording. <br />26. Location of Alluvial Wells <br />Both parties recognize that the two wells in place do not adequately gage <br />alluvial quality upstream and downstream of the loadout. Both parties agree that <br />the wells should be sampling the alluvium only, and not the underlying shale. <br />This issue will be resolved ae a revision to the permit after it ie in place. <br />