My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR12802
DRMS
>
Back File Migration
>
Application Correspondence
>
2000
>
APPCOR12802
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:33:11 PM
Creation date
11/19/2007 2:34:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Application Correspondence
Doc Date
3/24/1993
Doc Name
HAYDEN GULCH LOADOUT C-92-081 NOTES FROM CONFERENCE CALL
From
DMG
To
PEABODY WESTERN COAL CO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />131 } Sherman St., Room ? I S <br />Denver, CO 80203 <br />Phone: 1303) 866-3567 <br />FAX:(303)832-8106 <br />MEMO TO FILE <br />FILE ~: C-92-081 <br />OPERATOR: Hayden Oulch Terminal, Inc. <br />MINE: Hayden Oulch Loadout <br />DATES March 24, 1993~~0..(( ~^'('~P~ ~'O"~`4r <br />REC SPEC: Stephen Wathen <br />SUBJECT: Permit Application Review: <br />Responses to PAR <br />pF CO,O <br />`~~ b <br />N° `- O <br />• !'8 <br />Roy Romer <br />Governor <br />m ¢hael B. loop, <br />D rvision Director <br />PERSONS CONTACTED: Larry Routten, Erica Crosby, Steve Wathen of DMG; <br />Representatives of Peabody West Coal Company <br />HOW CONTACTED: Conference Call <br />COMMENTS: <br />Oaneral Comments: <br />HGTI: According to the purchase agreement between HGTI and HG Coal Company, HGTI <br />must have a permit by June 15, 1993. HGTI does not wish to continue to operate <br />under HG Coal's permit after that date. <br />DMG: Larry discussed with HGTI what was involved in getting a permit to them by <br />that date, especially the drafting of a findings document. Larry expressed his <br />belief that there were no issues that would seem to be of such a nature that a <br />permit could not be accomplished by June 15, 1993 and that it ie our intention <br />that HGTI have a permit by that date and preferably ASAP. <br />The Following PAR Concerns Were Discussed and Agreements Reached: <br />1. Identification of Interests <br />DMG: Departure dates are required for the AVS compliance check. <br />HGTI: Will submit departure dates for the names requested. <br />5. Change in Affected Acres <br />HGTI: The change in affected acres resulted in the addition of only one acre. <br />DMG: Thin concern has been addressed. No increase in application fee ie <br />required. <br />11. Macs <br />HGTI: Concern of engineers that maps displaying surface and mineral ownership <br />will be drawn utilizing Autocad using legal descriptions. This will result in <br />some inaccuracies between data points. <br />
The URL can be used to link to this page
Your browser does not support the video tag.