Laserfiche WebLink
<br /> <br />transposed from the surface mining provisions and is pertinent <br />to overburden analysis. The apoendix referenced here even <br />addresses all requested parameters under the heading "Baseline <br />Overburden Chemical-Dtineral Analysis." The requested data <br />cannot aid in the characterization of the proposed waste pile <br />as no coal wastes will be generated from the operations in <br />question. <br />2.04.6(2) (a) (V) <br />Sloughing of road cuts and face ups will be controlled by <br />commonly accepted, State of the Art construction techniques, <br />erosion controls, and maintenance. This is discussed appro- <br />priately in the text. A consultant has been employed toiconduct <br />additional studies along the steeper portions of the road, and <br />this data will be provided upon completion of the study. <br />2.09.7(1) <br />1. Tables 4.4-1 through 4.4-5 have been appropriately <br />modified to show water levels realized during ground water <br />sample collection. <br />2~ r Data presented clearly shows that no water will be <br />~~ <br />encountered for the proposed permit term (5 years). Tables <br />2.5-1 and 2.5-2 have been added to the data presented, address- <br />ing the monitoring schedule and parameters to be analyzed. <br />Data about presence or absence of ground water were obtained <br />from the coal exploration boreholes. The presence of water and <br />its level, or absence of ground water is determined from drillers <br />-9- <br />