Laserfiche WebLink
<br />t <br />•_ ~ ~ • <br />showing, along with the final cross sectional configuration <br />of the disposal site, the final cross sectional area. Figure <br />2.2-6 also shows final contours of the disposal site. <br />2. Table 3.7-2 has been provided to detail the reclamation <br />timetable as presently anticipated. <br />3. Chapter 3.0 has been modified,and now clarifies the <br />charts included in the application., <br />4. Cross sections of reclaimed areas are now shown on <br />Figure 3.1-1. <br />5., 6. Items #5 and #6 were dropped following discussions <br />in the review meeting. <br />7. Table 3.7-1 has been redone, and expanded in response <br />3' <br />to this request for additional information. <br />S. Supplemental information has been provided along with <br />clarification of the hydrologic situation relative to this <br />mining operation. Ido aquifers can be identified above the coal <br />seams to be mined during this permit term. <br />2.05.5 <br />'~~ ~ It was agreed that CMLR would evaluate end respond to <br />SEI's question as to whether the BLM's concurrence with the <br />mine plan constitutes landowner's approval for the permanent <br />diversion of the ephemeral channel, the waste rock disposal <br />• site, and the retention of a portion of the haul road in that <br />the BLM is the surface managing agency. <br /> <br />-11- <br />