Laserfiche WebLink
<br /> <br /> <br /> <br />2. As above, all requested information is provided in <br />Appendix M and in the 4.5 series of tables. <br />3. This question was eliminated as a result of discussions <br />in the review meeting. <br />2.05.3(5) <br />Tables 3.3-2 and 3.3-3 have been added to the application. <br />The text was also changed on pages 3-5 through 3-8 in response <br />to this question. <br />2.05.3(9) <br />1. Per discussions relevant to this comment, SEI has <br />provided information on the haulage of rock from McClane <br />3' <br />Canyon to the waste rock site in the Munger Permit Area:- It <br />is understood that the permitting of the underground develop- <br />ment waste rock disposal site can proceed with a stipulation <br />regarding reclamation. <br />Section 3.7 (page 3-20) has been modified to address the <br />abandonment of Munger Canyon relative to the fill area used <br />jointly for the Munger and McClane operations. <br />' 2., 3., 4. Geotechnical aspects of the waste rock disposal <br />site have been addressed in Section 2.2-5 with an embankment <br />analysis provided as Appendix N. <br />5. The design plan drawings and analyses have been <br /> <br />certified by a registered professional engineer. <br />2.05.9 <br />1. Figure 3.1-1 has'been modified to show reclaimed <br />topography in more detail. Figure 2.2-7 has been noted as <br />-10- <br />