Laserfiche WebLink
D. A. Berry <br />- 5 - Auquet 29, 1996 <br />or 1996} data which indicate the full hydrological <br />cycle. We acknowledge the presence of the 1984 data, <br />but more current information is recommended for these <br />i.lnportarrt surface features. <br />BRL - Enclosed are pond monitoring data for early May <br />and June 1996. The early May data, collected May 5th, <br />should suffice for the early season data requested by <br />the DMG. A data sheet is provided for the ponds for <br />insertion into Volume III, Exhibit 3. Please <br />reconsider your reluctance to recognize the 1984 pond <br />data. <br />i.:i.i} Dt-0G - Pletrse provide the flow rate data for the Deer <br />Trail Ditch {lower} for June 14, 1996, and, for the <br />Deer Trail Ditch (upper) for May 11, 1996 and June .14, <br />1996. <br />BRL - It is assumed the data requested is for 1995 not <br />1996. The flow data is not available. The flume in <br />the upper Deer Trail Ditch was not functioning properly <br />and the flow was not estimated for the May 11th and <br />June 14th monitoring event. The flow was not estimated <br />for the lower Deer Trail Ditch for June 14, 1995. <br />Enclosed are additional data for the Deer Trail ditch <br />(upper b lower) for early May and June 1996. The data <br />should be inserted into Volume III, Exhibit 3. <br />i.v) DMG - The ;sppl.i.c:ati.on indicates that seven groundwater. <br />monitoring locations were not observed until June or <br />July 1995. These looati.ons should have been monitored <br />also in April as recommended during the April 1995 <br />meeting. please provide April. data for either 1995 or' <br />199fi. <br />BRL - Enclosed are groundwater monitoring data for <br />early May and June 1996. The early May data, collected <br />May 5th, should suffice for the April data requested by <br />the DMG. Data sheets are provided for each drill hole <br />for insertion into Volume III, Exhibit 3. <br />v) DMG - Three alluvial wells downgradient. of the proposed <br />l.oadout were not :installed as recommended. This <br />recommendation was made to ensure proper baseline data <br />colleeti.orr. Provirie specific wall installation Plana <br />including proposed completion specifications, and <br />mapped l.oc:ati.ons. These wells will be r.•equired for <br />long term monitoring, as well as for the required <br />baseline data. Such wells are also recommendedl for <br />locations downgradient from the refuse pile. Iiow will <br />RRI, ensure that the wells will be installed and <br />