Laserfiche WebLink
<br /> <br />783.21 (Incorrectly labeled 783.22 b~,= applicant). <br />A soils map is now included, hoc:=ever it is illcE;ible, <br />therefore a usable copy which includes a scale and <br />a legend, musC be submitted. A description of <br />soil mapping unit 101-F which occurs in the permit <br />area (according to Plate 9, page 58, Pline Plan, <br />October 1980) should be submitted. Additionally, <br />the applicant must supply information on the <br />present and potential productivity of the soil. <br />units caithin those portions oL the permit area to <br />he affected by surface operations. <br />783.24 <br />(e) -=The location of anv man-m~rde surface and sub- <br />surface features, such as electric transmission <br />lines and pipelines, which lass over or through <br />the permit area, must be idenCiLied. <br />(f) Reference arcs must be established for vegetation <br />studies. Reference are~rs have not been mentioned <br />in the permit applications. In adJition, the <br />vegetation study area as identified in Exhibit :1' <br />of the second mine and reclamation plan application <br />(which caws recci'.'ed at OS1"i on October 27, 19`30) <br />appears to be inadequate in that it appears to he <br />less than tcao acres. Reference areas must be at <br />least two acres in size. <br />733.25 <br />(b) Provide elevations and locations of required <br />canter quality and quantity, fish and wildli.fc, and <br />air quality monitoring stations. <br />(j) Locat-ions of proposed wafer o:ells and depths must <br />be submitted. <br />784.13 The amount of suitable topsoil used in revege- <br />tation and the adequacy of this material needs to <br />be more clearly addressed. The applicant states <br />that approximately 2000 cubic yards will be needed <br />to cover the portal bench and access roads on'.th <br />four inches of topsoil ([9ine Plan, page 73, October <br />1980); however, preliminary calculations indicate <br />that up to 9000 to 10,000 cubic yards will be <br />required for the four inch depth for these two <br />areas. .4 clarification of the topooil volumes <br />individually required for the portal bench, access <br />roads, reservoir, coal stockpile, coal <br />. - . ---. <br />