Laserfiche WebLink
• • <br />X21) <br />~ i d, <br />4. The plan sets forth CWI's proposed methods for di <br />of excess rock and earth materials which may be encounter <br />the course of mining, and disposing of excavated material <br />in the construction of diversion structures are in accord <br />with the requirements of Section 715.15. <br />5. CWI's drainage system as set forth in the propose <br />plan, and supplementary information provided today, sets <br />how CWI intends to comply with the requirements of Sectie <br />for protection of the hydrologic system in the area of th <br />the haul and access roads, the parking facilities, and th <br />loop area. <br />posing <br />d in <br />produced <br />nce <br />mine <br />orth <br />717.17 <br />mine, <br />rail <br />6. CWI does not propose to construct any dams out of+waste <br />material or to impound waste material, which would be c <br />by Section 717.18. <br />7. As mentioned above, the mine plan sets forth CWI' <br />proposed methods for topsoil handling and revegetation. <br />effective and permanent vegetative cover capable of self- <br />and plant succession, and adequate to control soil erosic <br />be established on all disturbed lands in accordance with <br />and the requirements of Section 717.20. <br />-e d <br />diverse, <br />>_generation <br />will <br />le plan <br />Compliance with the special lease stipulations is also <br />provided for in the plan. ~ <br />(a) This lease shall be terminated when 1,966,667 tons of <br />"D" seam coal have been produced pursuant to production s~hedules <br />i <br />a~ i~ <br /> <br />~~~~; ~li~~ 1. ~ ~, <br />