Laserfiche WebLink
.. <br />(22) <br />in Appendix II. <br />This stipulation is self explanatory. CWI will cease'„all <br />mining operations at the Orchard Valley Mine when it has fined <br />1,966,667 tons of "D" Seam coal unless ttie present lease is <br />modified or a new lease is issued. <br />(b) Air <br />(i) The Lessee shall utilize and operate all faci aties <br />and devices in accordance with all applicable air quality <br />standards and related plans of implementation adopted pur want <br />to the Clean Air Act. (77 State. 392 as amended, 42 U.S.C.. <br />1857) as now in effect or as hereafter amended, or if it should <br />be superseded, the statute superseding it, and applicable <br />State standards. <br />(ii) During periods of heavy construction activity, the <br />lessee will institute a watering program for dust suppression. <br />(iii) Upon completion of construction, the lesseelwill <br />reclaim disturbed areas by means of chemical stabilizatio grading, <br />and planting of vegetation. <br />(iv) Hydrocarbon (HC) emissions devices will be <br />on all heavy duty vehicles, railroad locomotives, and off <br />vehicles utilized in connection with the lessee's operati <br />Sub-items (i), (ii), and (iv) are discussed in the a <br />subsection of the Methods of Operation section of the min <br />4.5.1.2 pages 30 an~c -3~ TTie remaining sub-item (iii) rz <br />the reclamation of disturbed areas upon the completion of <br />is treated in Section 414 Reclamation. <br />(c) The Lessee shall utilize and operate all facili~t <br />devices in accordance with State and Federal statutes (in <br />but not limited to, the Federal Water Pollution Control A <br />Stat. 1155, as amended, 33 U.S.C. 1251-1376) and regulati <br />now in effect or as hereafter amended, or if they should <br />superseded, the statute and regulations superseding them. <br />Compliance with the Federal Water Pollution Control <br />amended is covered in subsection 4.4.1.3.4 Surface Water <br />and Mitigation on page 45 of the mining plan. Monitorin <br />mitigation measures with respect to ground water are cov <br />the operational hydrology subsection (4.5.1.3.5). <br />equired <br />road <br />r pollution <br />ng plan. <br />uiring <br />construction <br />es and <br />luding, <br />t (62 <br />ns as <br />ct as <br />mpacts <br />an dd <br />ed in <br />!~ I~~o 1~11~`~, iti~J ~ ~ V. <br />