My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR11556
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR11556
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:31:54 PM
Creation date
11/19/2007 2:21:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2006085
IBM Index Class Name
Application Correspondence
Doc Date
12/3/2006
Doc Name
Application Review Memo
From
Jim Stark
To
Kent Gorham
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ventilafion shaft, including the reclamation of the collaz, filling of the shaft <br />and the placement and dimensions of the vent-pipe. <br />10. There is a typographical error on the third line of the second paragraph on <br />Page 2.05.3-13. The word "feet" should be changed to "foot". Please make <br />the necessary change and resubmit the page. <br />11. On Page 2.05.3-13 Northfield discusses the Mine Office Building. In the <br />discussion of dimensions of the building there is no height sated. <br />Additionally, the discussion states that the building will rest on stemwalls. <br />There aze, however, no dimensions given for the stemwalls. Please include a <br />building height and a discussion of the stemwalls in the discussion of the <br />Mine Office Building and resubmit the page. If Northfield has an engineering <br />design for the building this would be helpful for bonding purposes. <br />12. Page 2.05.3-14 discusses the Bathhouse Building. In the discussion of <br />dimensions there is no height stated. Please include a building height in the <br />discussion of the Bathhouse Building and resubmit the page. <br />13. Numerous buildings, including the Mine Office Building and the Bathhouse <br />Building, state that they will use a septic system and a leach field. This septic <br />system will need to be removed reclaimed upon final reclamation of the site. <br />Please provide the Division with detailed plans for the septic system and leach <br />field for bonding purposes. Engineering designs would be useful for this <br />purpose. <br />14. Pages 2.05.3-15 and 2.05.3-16 discuss the Crushing and Screening Plant. No <br />information, however, is given regarding the buildings concrete pad or <br />footers, Please provide the concrete pad and footer information is the <br />discussion of the Crushing and Screening Plant and resubmit the appropriate <br />page (s). <br />15. Page 2.05.3-18 discusses the Truck Scale. There are no dimensions or <br />construction given for the Truck Scale. Additionally, there is no discussion as <br />to whether there is a scale house at the Truck Scale. Please provide a detailed <br />description of the truck scale on this page and resubmit the page. If there is a <br />scale house, please include this information on the updated page. <br />16. Page 2.05.3-18 briefly discusses Topsoil Stockpiles. Please include a <br />reference of the page(s) in Section 2.05.4 where additional topsoil information <br />can be found. <br />17. Pages 2.05.3-18, 2.05.3-19 and 2.05.3-20 discuss the mine's haul road, access <br />roads and light-use roads. The pages include brief descriptions of these roads. <br />The Division, however, needs more detailed information for bonding <br />
The URL can be used to link to this page
Your browser does not support the video tag.