Laserfiche WebLink
' <br /> rwl= C.u~.~~c)l=, - cac~:fill~ng and Graarng <br />' ine applicant coanents, on page 1V-5 of the amenaed application docunierr_, <br />z <br />d i <br />ll <br />f <br /> n <br />i <br />e <br />roar auger mimn; pits Ivo. o, fro. 7, and Ivo. B will be back <br /> configuration which varies from the pre-mining topography. Schematic <br /> cross-sections of a typical auger area are presentee in Figure 1 of <br />Tne applicant <br />lication <br />d <br /> . <br />app <br />Section 2.06.9, page V-lb of the amende <br /> should include this cross-reference within the text of Rule 2.05.4. In <br /> the applicant should expand the rather vague and ambiguous <br />addition <br />' , <br />statement concerning final topography of the angered pit areas. Tne <br /> applicant shoulo specifically discuss wny the configuration proposed ire <br /> figure 1 of section 2.06.9 constitutes the reconstruction of approximate <br />I original contour. <br /> Kln. sine Faciiitie;, Loal Nandiing Structures, Support Facilities - <br /> icules[.05.3(~„L.U~.~ii) ano 4.v~. <br /> In light of the cnanges tna nave occurreo at the mine since the latest <br /> submission of permit application materials, the application must be <br />_ modified with respect to the current situation at the mine site. Detail <br /> must be provided with respect to the explosive storage area and the shop <br /> area near Pit iao. 5. rrimarily building dimensions, construction <br /> specifications (founaation type) and drainage control must be provided at <br />' a minimum. wt this time the Division cannot find the operation in <br />compliance with the requirements of this section. <br /> <br /> X~.. Roads -r,ales ..05.3(3) and 4.U3 <br /> Haul road construction details, profiles, typical cross sections and <br /> drainage designs are provided for the Pit 4 haul road. Design drawings <br /> and construction and drainage details are not provided for other proposed <br /> haul roads. Igo information is provided for pre-existing roads. <br /> 1. For pre-existing haul road segments, as indicated on the mine plan <br /> map, the applicant should suo~nit information required by Rules <br /> 2.05.3(b)(i) B, C, and D regarding current status, construction <br /> dates and compliance with design standards of kule 4.03. <br /> 2. For additional Haul roads to be constructed this permit term, <br /> (other than the Pit 4 haul road) information on aesign, <br /> construction an:. drainage as spec ifiea by kule 2.U5.3(3)(c) must <br /> be submitted. <br /> 3. The application states that; based upon the landowner's request, <br /> haul roads will remain following mining and reclamation. The <br /> usefulness of the main haul road and the Pit 4 haul road with <br /> regard to providing access to the property is apparent. The <br /> justification for the short road segments which provide access to <br /> Pits 5, 7, and 8 is not apparent. These road segments should be <br /> reclaimed, unless the landowner specifically requests that they <br /> remain. <br /> <br /> <br />