Laserfiche WebLink
_~~ <br />Pa.{e :':-uU states tnat roads inciden~.al to the developar„nC or parCals anu <br />cunstructlun efforts may De construc~.ed - as needed. This state,aent needs <br />to ue uelaCeu fruni the application „nd replaced r+ith a state~uenr, that <br />clearly states all mine roads will De properly designed and approved by <br />i~1LhU prior to construction and use, in accordance with itules 2.05.3(3) and <br />4.u3. Flo uisturbance will occur prior to approval by the Division. <br />A comparison of the Reclamation P1ap (IV-10) and the Haul Goad i-lap (IV-'. 5) <br />indicates several road sey~nents to h..: retained afier mining. The roads <br />include a 7,LUU Ft. seynient of the haul road connecting the i~o. 5 wire <br />witn the refuse: pile, a l,U5U Ft. access road (an off-ramp from the <br />southbound lane of 'the State Highwayj, and a 10,000 ft. access road that <br />leads southerly frrm I;he No. 9 mine area past the oFfices to the fin. ~A <br />area. For the Uivision Co approve the retention or these roads, the <br />operaCUr ~uusC supply londuwncr cnnsc~~l in .,ccorrJ.rncc wiCli Rula +I. U3.1(f), <br />4.US.Z(l)(F) anti +4.US.1(u). 1=urther~~wr•e, Iur the Uivision to uppruve tl,~ <br />retention of a haul road compatible :+ith the post-mining land use, the <br />operator needs to either justify the need for Chat size road or agree to <br />reduce 'Che road size to access road 'standards. IF landovmer consen~ <br />cannot be obtained, the operator shall commit to reclaiming the roads. <br />4Jne.n lanaowner consent is available, the operator nay request a change in <br />the roan reclamation plan through Che revision process. (For Donning <br />purl%oses Che Uivision dill include road reclamation costs.) <br />L'. Ponds, Impoundments and Diversions <br />CRITiC++L CO:iCtlt?JS - <br />Tnese concerns must De resr,lved prior to per;oit issuance. <br />Tne Uivision has identified the following areas ,•+here Empira Energy <br />Corporation has requested a variance from sediment control: <br />hock dust tanks <br />t4ine water treatment facilities <br />13oreholes <br />Se,•+age l agoon anti polishing pond <br />Empire oFfice complex ;adjacent to village) <br />Empire must indicate if any other areas are being requested for the <br />variance. <br />STIPULATi01JS - <br />These concerns could De stipulated as conditions to the per;nit. <br />._ ~=I'?1::ayc aaL ~edl2ilt control Cei-~yn5 alld Cd1C..laClGfli '.led: t0 be <br />ce;-tified by a qualified registered professional engineer in accor•oance <br />:vith Rule 2.05.3(4)(a)(i)(A?. „lso, all naps, drawings and cross-sections <br />pert-.ininy to the drainage and sediment control system need to ce <br />certified by a professional engineer in accordance with Kula 2.10.3(2). <br />