My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR11208
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR11208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:31:36 PM
Creation date
11/19/2007 2:18:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Application Correspondence
Doc Name
LORENCITO CANYON MINE PR EXHIBIT 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
methods to be covered with non-toxic spoil. If "shale and other extraneous material" will be <br />• returned to the pit floor, those materials must be determined to be non-toxic prior to their <br />placement. <br />e n <br />LCC will employ a breaker facility at the loadout, and acknowledges that the Division <br />considers this material coal processing waste. Additional discussion has been added to <br />Section 2.05.3(8) on revised page 2.05-40. LCC has provided geochemical documentation <br />on roof, coal, floor and overburden materials anticipated from the site in Exhibit 6. In <br />addition, page 2.05-59 in Section 2.05.4 includes a commitment to sample plant growth <br />medium prior to seeding. <br />74. Please provide the engineering designs for the four concrete portal openings at the P ] portal <br />site, the four concrete portal openings at the P2 portal site, the fotu concrete portal operings <br />at the P3 portal site, the four concrete portal openings at the Rl portal site and the three <br />concrete portal openings at the R2 portal site (Section 2.05.3(3)(a)). Please provide a cross <br />section that demonstrates how far into each hillside the concrete structures will extend, and <br />indicate the different safety bench configurations proposed. <br />es onse <br />• Figure 2.05.3-4a has been added to show engineering design for the concrete portal openings <br />for the underground mines. This includes cross-sections showing the extension of the <br />concrete structures. Figures 2.05.3-5 through 2.05.3-7 show the safety bench configuration <br />at each portal site. <br />75. Please provide on a map the location of all existine underground and overhead utility lines, <br />utility poles, and substations/ttansformers. Please provide on the same map the location of <br />all prooosed utility lines, poles, substations, and light-use maintenance roads (Sections <br />2.05.3(3)(a) and (b)). <br />Res~nse <br />This information is shown on Map 2.05-3-I, Mine Plan and on a new Map 2.05.3-4, Surface <br />Blasting Area, as discussed on revised page 2.05-37a. <br />76. Please provide engineering plans and drawings for the location, construction, use and <br />maintenance of the railroad spur. These should include specifications for width, gradient, <br />surfacing, fills, hillside cuts, embankments, and culverts. (Sections 2.05.3(3)(a), 2.05.3(3)(c) <br />and 4.04) <br />Response <br />• Engineering plans for the railroad spur aze show in Exhibit 19. <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.