Laserfiche WebLink
~J <br /> <br />3. The runoff characteristics of the area were described in <br />the meeting with OSM and the CMLR. It was decided that no <br />additional data need be provided. <br />4. The periodic removal of sediments from the pond is addressed <br />in Section 2.4.4 (page 2-28a). <br />5. The pond is incised with the embankment material coming <br />from this action. As this was explained to the satisfaction <br />of CASLR, no reference was made in the application text. <br />6. All discharge structures, in conjunction with Appendix M <br />and Tables 4.2-11 and 4.2-12, have been adequately addressed. <br />7. It was decided to drop this question. <br />2.05.3(9) (4.09) <br />The requested information has been included in Sections 2.1 <br />and 2. 2. <br />No statement was provided on the handling of bone coal as it <br />was not necessary or applicable to the operation. <br />2.05.4(1) and (2) (4.06, 4.19, 4.15) <br />Table 3.7-2 was provided to show completion of phases of the <br />reclamation plan (year 2011) by quarters. In that the reclama- <br />tion plan is presently anticipated in the year 2011, it was <br />felt adequate and logical to address the work by quarters. <br />