My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR10641
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR10641
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:27:00 PM
Creation date
11/19/2007 2:12:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Application Correspondence
Doc Name
Initial adequacy review
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• b) the elevations of the fill toe bottom, the top of the back of fill, and the slope of <br />the valley profile through that section of the valley (Table 1 of Figwe 1 of Exhibit <br />13 may no longer be correct if the Fill elevations shown on Map 2.05.4-1 aze the <br />actual planned fmal elevations) <br />c) the results of the individual geotechnical studies done to demonstrate compliance <br />with Section 2.05.3(6)(b), (c), and (d). (The materials provided in Exhibit 13 state <br />that the findings provided in that report aze preliminary, and that fwther testing <br />should be done to confirm preliminary conclusions.) <br />d) the material planned for use as the filter fabric for the rock drains (Section <br />4.09.2(2)(c)). <br />e) Identify those fills which fall into CTL Thompson's category of "non-valley fills" <br />(Figwe 5, Exhibit 13), for the purposes of drain construction. <br />92. On page 2.05-10, it is stated in the fifth paragraph that overbwden from the surface mine <br />will be pushed with dozers and end-dumped into the bottom of the fills. As both Sections <br />4.09.1(7) and 4.09.2(3) require spoil to be transported and placed in horizontal lifts, and <br />as the CTL Thompson report states that "the fills will be constructed from above, with <br />spoil trucked or dozed down to the fill surface", please remove any reference in the <br />application to end-dumping material into the fills. <br />93. On page 2.05-]0, it is stated that "rock drains will be installed on each side of the fill to <br />carry runoff to a sediment control structwe". Please change the words "rock drains" to <br />"riprapped diversion ditches", to avoid confusion with the subdrains proposed beneath the <br />fills. <br />O~L 94. Please provide the volumes of the portal backfill stockpiles. <br />95. Please provide a statement in the "Surface Blasting Plan" text, which begins on page 2.05- <br />36, that states that Lorencito Coal Company, in conducting swface blasting activities, will <br />comply with all applicable State and Federal laws in the use of explosives and <br />((( ppp~~~~~ ~~ ~~ requirements of Section 4.08 of the Board's regulations in consultation with appropriate <br />~ 0 C ti~ State agencies (Section 4.08.1(1)). <br />A5 96. Please state that all swface blasting activities will be conducted by experienced, trained, <br />,V~,_97'^' and competent persons who understand the hazards involved, that persons responsible for <br />~~ blasting operations at a blasting site will be familiar with the blasting plan and any site- <br />specific performance standazds, that the blaster and at least on other person will be present <br />at the firing of a blast, and that each person responsible for blasting operations will <br />possess a valid certification in accordance with appropriate Federal and State laws <br />(Section 4.08.1(3)). <br />97. Because blasting operations will be conducted within 500 feet of an active underground <br />mine, an anticipated blast design, prepared and signed by a certified blaster (Section <br />. 1.04(20a)), must be submitted either as part of a permit application or at a time before the <br />~\~ ~ blast approved by the Division (Section 4.08.1(4)(a)(ii)). Figure 2.05.3-i7 is not signed, <br />and does therefore not qualify as the required blast design. Please provide this <br />
The URL can be used to link to this page
Your browser does not support the video tag.