Laserfiche WebLink
• -2- • <br />t <br />5. A map locating all sites where hydrologic information was <br />obtained. <br />6. Discussion of past and future monitoring procedures at the mine. <br />Should include A) How quality samples are obtained B) Storage and <br />preservation methods C) Whether samples are obtained at the same time <br />flow and water level measurements are made D) Specifications of the <br />instruments used to measure flow. <br />D. Hydrologic Impacts <br />1. A statement of probable hydrologic consequence and life of mine <br />map must be provided. <br />E. Topsoil <br />1. Actual pedon descriptions for soils sampled need to be provided. <br />2. The correlation between sample sites as mapped and as described in <br />the soils analysis table needs to be explained. <br />3. How stripping depths were proposed needs to be explained. <br />F. Prime Farmland <br />1. A letter from SCS stating the absence of prime farmland needs to <br />be provided. <br />G. Operations Description <br />1. The applicant needs to provide a discussion of methods to place <br />unsuitable OB, topsoil or weathered coal in the pit. How these <br />materials will affect reclamation and/or subsurface HZO. <br />H. Backfilling and Grading (AOC) <br />1. A swell factor and corroborating calculations need to be provided. <br />2. A discussion of post mining topography and approximate original <br />contour needs to be provided. <br />3. A discussion of special handling of toxic OB, soils,weathered <br />coal needs to be provided. <br />4. A discussion of contemporaneous reclamation needs to be provided. <br />5. Specific discussion of why East Dump is required. <br />I. Coal Processing Waste and Non-Coal Processing Was <br />1. A discussion addressing existence and disposal methods for these <br />must be included. <br />