Laserfiche WebLink
• _g_ <br />J. Roads <br />1. A map identifying all roads used or anticipated, identified as <br />haul road,access road, or light use road. <br />2. Locations of all culverts and road drainage structures on a map. <br />Design calculations should be included. <br />3. A maintenance plan should be included. <br />4. A discussion of road surfacing materials must be included. <br />5. Certification of construction of all haul roads. <br />6. Worst case specifications for road width, grade, crown, road cut <br />or fill for each road. <br />K. Bonding <br />1. A worst case presentation for bonding costs should be presented. <br />L. Sealine Drill Holes <br />1. A discussion of how any drill holes (including water monitoring <br />wells) will be plugged, sealed, or managed. <br />M. Surface Mines Adjacent to U/G Mines <br />1. MSHA approval to mine through abandoned the mine must be submitted. <br />N. Cessation of Operations <br />1. A discussion of measures to be undertaken should temporary or <br />permanent cessation of operations occur. <br />/ep <br />