My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR10327
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR10327
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:26:43 PM
Creation date
11/19/2007 2:09:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981034
IBM Index Class Name
Application Correspondence
Doc Date
8/27/1982
Doc Name
MR TO C-034-81
From
GRAND MESA COAL CO
To
MLR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05.3 (3) (b) (vi) (C:) - <br />The DG7ta T'ontrose Elr_ctr.ic Assec.iation pro~•csal is to convst_ruct <br />,. <br />a new line along the above refere:,ced easem^nt. The easement may <br />he in effect longer than the mine Faciliti^s; therefore, reclamation <br />is not being considered Grand Mesa Coal Company's respon,ibility. <br />Reclamation of the mine property may have to be slightly modifiec] <br />to permit Delta-M,ont rose Plectric ,lssociat.ion to maintain accr.,;s <br />to the above described easement. <br />A 2500 P,VA substation was constructed in the par};ing lot [•dest of <br />the bath house during the summer of 1982. The eight (8) pole <br />structure is enclosed in a six (6) feet cha~.n lint. fenced area <br />80 x 43 feet. The substation is designed to a11o•~r replacement <br />of only the transformers to upgrade the system to 7500 KVA. The <br />substation is centrally located fo'r power distribution to both <br />mines. <br />Additional 12,460 V lines wi7.1 be constructed as shown in <br />Drawing 2.05.3(b)(vi)(C)-2 to connect the new substation to the <br />er.isting substation in the :service P.rea. At the same time part of. <br />the existing line will be removed. The proposed location of the <br />new lines i.s out of the way of any proposed expansion, and therefore <br />should be adequate to see-/e the Red Canyon N] Mine foe the life of <br />the I4i.ne. <br />(vii) I'°ari: Storay„ Ynrc] <br />'Phe parts storage yard hid been used For many years as a jun}; yard <br />before Grand Mesa coal Coml:any adui red the nropcrt-y. Gran~7 tdcsa <br />Coal Company had reduced the pile to usable material. Little actual <br />disturbance has ta};en place there. Refer to t-he Reclamation Plan, <br />Section 2.05.4, f.or details on the removal of this surface facility. <br />Refer to the Affected Land hta,~, ?.04.3(7_)(a)-2, Lor the location <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.