Laserfiche WebLink
~~-~ni~R ~~r?g-nA~P"*Aztf <br />fi-' <br />`Y <br />August 19, 1982 <br />Mined Land Reclamation <br />923 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br /> <br /> <br /> <br />ATTN: Dan Mathews, Reclamation Specialist <br />Re: Minor Revision to C-034-81 <br />Dear Dan, <br />~~I II~IIIII~II~~ I~~ <br />First and Cof~lmbla <br />P.O Box 225 <br />Della, Calo ~t416 <br />Office: (303) 874-7567 <br />Mine. 13031 S5G-6402 <br />As discussed in our telephone conversation August 16, 1982 a minor <br />revision is being requested to establish a new power line from the <br />new substation to the existing fan and substation. Attached is a <br />copy of a portion of map # 2.05.3(2)(b)-1, Proposed Surface <br />Disturbance Map, which shows the location of the new substation noor <br />in progress and the new powerline to tie it into the existing system. <br />The new route was chosen because following the old route from the <br />bath house North would require total reconstruction including new <br />poles and new wire and would be longer. <br />Three poles would be installed outside the disturbed boundary, Access <br />to the two Lower poles will be gained by the road to the old junk yard <br />West of the office. The third pole will be reached by temporarily <br />removing a portion of the berm around the Service Area. No grading <br />will be necessary to set any of these poles. A few trees may need <br />trimmed or removed along the route. <br />Please replace page 92a with revised pages 92a and 92b and Drawing <br />2.05.3(3)(b)(vi)-2. <br />Construction is anticipated in early September, please let me know <br />if there is any problem. <br />Yours Truly; /~ <br />Larry M. R~chke <br />Mine Engineer <br />LMR/ab <br />enclosures <br />